Our portfolio boasts projects as diverse as School Installations, Church Refurbishments, Car Showrooms, and High-Spec Residential housing, all of which have been expertly constructed by our team of in-house fitters.

Tonbridge School

Proposed Mechanical Programme: 90 days on site (March – August 2018)

Project entails the refurbishment and new-build extension to the existing Science block located at the Tonbridge School. This project is the latest in a long line of prestigious works we’ve undertaken for this particular Building company, and is a great reminder that over 65% of our workload comes from repeat business.

Scope of work:

  • Complete plant room installation
  • Wet heating system including underfloor heating, radiators and over door heaters
  • Direct ducted extract ventilation
  • Bespoke user-friendly controls package
  • Domestic hot and cold water services including drainage

Nightingale House

Mechanical Programme: 66 Days on site (late 2016 – early 2017)

Nightingale house is one of London’s specialist care-homes, and this project saw us undertaking a large-scale restoration to one of the floors. Despite being beset by issues outside of our control for the duration of the works, our ability to adapt and react quickly to change resulted in an outstanding result that fully met the client’s expectations.

Scope of work:

  • Plant room installation
  • Complete new radiator heating installation
  • Bespoke user-friendly TREND controls package

Croydon Council: Beckmead SEN School

Proposed Mechanical Programme: 37 days on site (July – September 2017)

DWHP acted as contractors on this project, having been tasked with the design and implementation of a complete heating system renewal at this SEN school. The entire design of the new system was controlled by ourselves, from the plant to the layout of the pipework, and we successfully completed the installation across the entire school within the short summer break.

Scope of work:

  • Plant room installation
  • Complete new radiator heating installation
  • Bespoke user-friendly TREND controls package

Becket Keys – The Welby Building

Mechanical Programme: 66 Days on site (late 2016 – early 2017)

The creation of a new-build, two-storey extension at an existing school, Becket Keys stands as testament to the incredible work ethic of our in-house technicians. Despite the extent of the works required within the short programme allotted, we were able to turn the mechanical installation around within the time-frame expected, whilst maintaining our trademark standards of quality.

Scope of work:

  • Plant room installation
  • Complete new radiator heating installation
  • Bespoke user-friendly TREND controls package

Brook House

Proposed Mechanical Programme: 37 days on site (July – September 2017)

At the time, Brook House was the largest project undertaken by DWHP. Located in the London Borough of Haringey, this new-build primary school allowed us to prove that we were capable of handling larger scale mechanical installations. Completed within budget, and well within programme, Brook House remains one of our most successful projects.

Scope of work:

  • Plant room installation
  • Complete new radiator heating installation
  • Bespoke user-friendly TREND controls package