Becket Keys – The Welby Building
Contract Value: £260,000.00
Mechanical Programme: 41 days on site (late 2016 – early 2017)
Description: The creation of a new-build, two-storey extension at an existing school, Becket Keys stands as testament to the incredible work ethic of our in-house technicians. Despite the extent of the works required within the short programme allotted, we were able to turn the mechanical installation around within the time-frame expected, whilst maintaining our trademark standards of quality.
Scope of works:
- Complete plant room installation split over 3 floors
- Wet underfloor heating system throughout
- Domestic hot and cold water services including drainage
- Direct ducted extract ventilation to WC’s and 2no teaching areas utilising automatic constant volume dampers
- Natural ventilation to 1st and 2nd floor classrooms
- Internal rain water down services
- Bespoke TREND control package