Thanks For Getting In Touch!

We've successfully received your enquiry. One of our expert team members will aim to be in touch within 12 - 24hrs. In them meantime, why not check out some of our showcase below.

Brook House

Mechanical Contract Value: £720,000.00

At the time, Brook House was the largest project undertaken by DWHP. Located in the London Borough of Haringey, this new-build primary school allowed us to prove that we were capable of handling larger scale mechanical installations. Completed within budget, and well within programme, Brook House remains one of our most successful projects.

Scope of work:

  • Plate heat exchanger supplied by a central boiler room

  • Wet underfloor heating system throughout

  • Domestic hot and cold water services including drainage
  • Heat recovery ventilation to all classrooms/offices
  • Direct ducted extract ventilation to WC’s
  • Air conditioning to IT/server room
  • Bespoke user friendly controls package

Becket Keys – The Welby Building

Mechanical Contract Value: £260,000.00

The creation of a new-build, two-storey extension at an existing school, Becket Keys stands as testament to the incredible work ethic of our in-house technicians. Despite the extent of the works required within the short programme allotted, we were able to turn the mechanical installation around within the time-frame expected, whilst maintaining our trademark standards of quality.

Scope of work:

  • Complete plant room installation split over 3 floors

  • Wet underfloor heating system throughout

  • Domestic hot and cold water services including drainage
  • Direct ducted extract ventilation to WC’s and 2no teaching areas utilising automatic constant volume dampers
  • Natural ventilation to 1st and 2nd floor classrooms
  • Internal rain water down services
  • Bespoke TREND control package